Подписаться
Tae-Eog Lee
Tae-Eog Lee
KAIST, Department of Industrial & Systems Engineering
Подтвержден адрес электронной почты в домене kaist.ac.kr - Главная страница
Название
Процитировано
Процитировано
Год
Scheduling analysis of time-constrained dual-armed cluster tools
JH Kim, TE Lee, HY Lee, DB Park
IEEE Transactions on Semiconductor Manufacturing 16 (3), 521-534, 2003
3092003
A three-level supply chain network design model with risk-pooling and lead times
S Park, TE Lee, CS Sung
Transportation Research Part E: Logistics and Transportation Review 46 (5 …, 2010
1892010
Scheduling single-armed cluster tools with reentrant wafer flows
HY Lee, TE Lee
IEEE transactions on Semiconductor Manufacturing 19 (2), 226-240, 2006
1722006
A review of scheduling theory and methods for semiconductor manufacturing cluster tools
TE Lee
2008 Winter simulation conference, 2127-2135, 2008
1692008
An extended event graph with negative places and tokens for time window constraints
TE Lee, SH Park
IEEE Transactions on Automation Science and Engineering 2 (4), 319-332, 2005
1672005
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net
JH Kim, TE Lee
IEEE Transactions on Automation Science and Engineering 5 (3), 490-503, 2008
1522008
Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes
CF Chien, S Dauzère-Pérès, H Ehm, JW Fowler, Z Jiang, ...
European Journal of Industrial Engineering 4 5 (3), 254-271, 2011
1302011
Workload balancing and scheduling of a single-armed cluster tool
TE Lee, HY Lee, YH Shin
APIEMS, 1-6, 2004
1252004
An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems
C Jung, TE Lee
IEEE Transactions on Semiconductor Manufacturing 25 (2), 186-199, 2011
1232011
Performance measures and schedules in periodic job shops
TE Lee, ME Posner
Operations Research 45 (1), 72-91, 1997
1161997
Noncyclic scheduling of cluster tools with a branch and bound algorithm
HJ Kim, JH Lee, TE Lee
IEEE Transactions on Automation Science and Engineering 12 (2), 690-700, 2013
1132013
Scheduling cluster tools with ready time constraints for consecutive small lots
HJ Kim, JH Lee, C Jung, TE Lee
IEEE Transactions on Automation Science and Engineering 10 (1), 145-159, 2012
1132012
Modeling and implementing a real-time scheduler for dual-armed cluster tools
YH Shin, TE Lee, JH Kim, HY Lee
Computers in Industry 45 (1), 13-27, 2001
1132001
Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation
TK Kim, C Jung, TE Lee
International Journal of Production Research 50 (10), 2785-2795, 2012
842012
Petri net modeling and scheduling for cyclic job shops with blocking
JS Song, TE Lee
Computers & Industrial Engineering 34 (2), 281-295, 1998
811998
A branch and bound algorithm for cyclic scheduling of timed Petri nets
C Jung, HJ Kim, TE Lee
IEEE Transactions on Automation Science and Engineering 12 (1), 309-323, 2013
722013
Scheduling cluster tools for concurrent processing of two wafer types
JH Lee, HJ Kim, TE Lee
IEEE Transactions on Automation Science and Engineering 11 (2), 525-536, 2014
712014
Scheduling lot switching operations for cluster tools
JH Lee, HJ Kim, TE Lee
IEEE Transactions on Semiconductor Manufacturing 26 (4), 592-601, 2013
702013
Noncyclic scheduling for timed discrete-event systems with application to single-armed cluster tools using Pareto-optimal optimization
U Wikborg, TE Lee
IEEE Transactions on Automation Science and Engineering 10 (3), 699-710, 2012
702012
Stable earliest starting schedules for cyclic job shops: a linear system approach
TE Lee
International Journal of Flexible Manufacturing Systems 12, 59-80, 2000
692000
В данный момент система не может выполнить эту операцию. Повторите попытку позднее.
Статьи 1–20