Follow
R.M. Chandima Ratnayake
R.M. Chandima Ratnayake
Verified email at uis.no - Homepage
Title
Cited by
Cited by
Year
Technical integrity management: measuring HSE awareness using AHP in selecting a maintenance strategy
RM Chandima Ratnayake, T Markeset
Journal of quality in maintenance engineering 16 (1), 44-63, 2010
962010
Machine learning approach for risk-based inspection screening assessment
A Rachman, RMC Ratnayake
Reliability Engineering & System Safety 185, 518-532, 2019
832019
Application of a fuzzy inference system for functional failure risk rank estimation: RBM of rotating equipment and instrumentation
RMC Ratnayake
Journal of Loss Prevention in the Process Industries 29, 216-224, 2014
662014
Development of a risk matrix and extending the risk-based maintenance analysis with fuzzy logic
RMC Ratnayake, K Antosz
Procedia Engineering 182, 602-610, 2017
642017
Maintaining sustainable performance in operating petroleum assets via a lean-six-sigma approach: A case study from engineering support services
RMC Ratnayake, O Chaudry
International Journal of Lean Six Sigma 8 (1), 33-52, 2017
612017
Enhancing offshore process safety by selecting fatigue critical piping locations for inspection using Fuzzy-AHP based approach
A Keprate, RMC Ratnayake
Process Safety and Environmental Protection 102, 71-84, 2016
612016
Asset integrity management for sustainable industrial operations: measuring the performance
RM Chandima Ratnayake, T Markeset
International journal of sustainable engineering 5 (2), 145-158, 2012
512012
Spare parts’ criticality assessment and prioritization for enhancing manufacturing systems’ availability and reliability
K Antosz, RMC Ratnayake
Journal of Manufacturing Systems 50, 212-225, 2019
472019
Applications of machine learning in pipeline integrity management: A state-of-the-art review
A Rachman, T Zhang, RMC Ratnayake
International journal of pressure vessels and piping 193, 104471, 2021
462021
Industrial asset maintenance and sustainability performance: economical, environmental, and societal implications
JP Liyanage, F Badurdeen, RMC Ratnayake
Handbook of maintenance management and engineering, 665-693, 2009
462009
Sustainable performance of industrial assets: the role of PAS 55-1&2 and human factors
RMC Ratnayake
International Journal of Sustainable Engineering 6 (3), 198-211, 2013
412013
Adaptive Gaussian process regression as an alternative to FEM for prediction of stress intensity factor to assess fatigue degradation in offshore pipeline
A Keprate, RMC Ratnayake, S Sankararaman
International Journal of Pressure Vessels and Piping 153, 45-58, 2017
402017
A decision model for executing plant strategy: maintaining the technical integrity of petroleum flowlines
RMC Ratnayake
International Journal of Decision Sciences, Risk and Management 4 (1-2), 1-24, 2012
402012
Enhancing aircraft maintenance services: a VSM based case study
D Stadnicka, RMC Ratnayake
Procedia Engineering 182, 665-672, 2017
392017
Modelling of asset integrity management process: a case study for computing operational integrity preference weights
RMC Ratnayake
International Journal of Computational Systems Engineering 1 (1), 3-12, 2012
392012
Development of an empirical formula for machine classification: Prioritization of maintenance tasks
D Stadnicka, K Antosz, RMC Ratnayake
Safety Science 63, 34-41, 2014
382014
Strengthening, modification and repair techniques’ prioritization for structural integrity control of ageing offshore structures
SMK Samarakoon, RMC Ratnayake
Reliability Engineering & System Safety 135, 15-26, 2015
372015
Challenges in inspection planning for maintenance of static mechanical equipment on ageing oil and gas production plants: The state of the art
RMC Ratnayake
International Conference on Offshore Mechanics and Arctic Engineering 44939 …, 2012
372012
Minimizing hydrocarbon release from offshore piping by performing probabilistic fatigue life assessment
A Keprate, RMC Ratnayake, S Sankararaman
Process Safety and Environmental Protection 106, 34-51, 2017
332017
KBE development for criticality classification of mechanical equipment: A fuzzy expert system
RMC Ratnayake
International journal of disaster risk reduction 9, 84-98, 2014
332014
The system can't perform the operation now. Try again later.
Articles 1–20