Follow
Vincent Boyer
Title
Cited by
Cited by
Year
Solving knapsack problems on GPU
V Boyer, D El Baz, M Elkihel
Computers & Operations Research 39 (1), 42-47, 2012
1112012
Heuristics for the 0–1 multidimensional knapsack problem
V Boyer, M Elkihel, D El Baz
European Journal of Operational Research 199 (3), 658-664, 2009
1002009
Vehicle and crew scheduling for flexible bus transportation systems
V Boyer, OJ Ibarra-Rojas, YÁ Ríos-Solís
Transportation Research Part B: Methodological 112, 216-229, 2018
622018
Multi GPU implementation of the simplex algorithm
ME Lalami, D El-Baz, V Boyer
2011 IEEE International Conference on High Performance Computing and …, 2011
622011
Efficient implementation of the simplex method on a CPU-GPU system
ME Lalami, V Boyer, D El-Baz
2011 IEEE International Symposium on Parallel and Distributed Processing …, 2011
562011
Recent advances on GPU computing in operations research
V Boyer, D El Baz
2013 IEEE International Symposium on Parallel & Distributed Processing …, 2013
432013
Dense dynamic programming on multi GPU
V Boyer, D El Baz, M Elkihel
2011 19th International Euromicro Conference on Parallel, Distributed and …, 2011
372011
Distributed part differentiation in a smart surface
D El Baz, V Boyer, J Bourgeois, E Dedu, K Boutoustous
Mechatronics 22 (5), 522-530, 2012
362012
A branch-and-price algorithm for the multi-activity multi-task shift scheduling problem
V Boyer, B Gendron, LM Rousseau
Journal of Scheduling 17, 185-197, 2014
352014
Solution of multidimensional knapsack problems via cooperation of dynamic programming and branch and bound
V Boyer, D El Baz, M Elkihel
European Journal of Industrial Engineering 4 (4), 434-449, 2010
352010
Multi-depot periodic vehicle routing problem with due dates and time windows
R Cantu-Funes, MA Salazar-Aguilar, V Boyer
Journal of the operational research society 69 (2), 296-306, 2018
342018
Flexible job-shop scheduling problem with resource recovery constraints
J Vallikavungal Devassia, MA Salazar-Aguilar, V Boyer
International Journal of Production Research 56 (9), 3326-3343, 2018
312018
A procedure-based heuristic for 0-1 Multiple Knapsack Problems
ME Lalami, M Elkihel, D El Baz, V Boyer
International Journal of Mathematics in Operational Research 4 (3), 214-224, 2012
312012
A parallel machine batch scheduling problem in a brewing company
CA Sáenz-Alanís, J VD, MA Salazar-Aguilar, V Boyer
The International Journal of Advanced Manufacturing Technology 87, 65-75, 2016
262016
A matheuristic based on Lagrangian relaxation for the multi-activity shift scheduling problem
NA Hernández-Leandro, V Boyer, MA Salazar-Aguilar, LM Rousseau
European Journal of Operational Research 272 (3), 859-867, 2019
222019
A dynamic programming method with lists for the knapsack sharing problem
V Boyer, D El Baz, M Elkihel
Computers & Industrial Engineering 61 (2), 274-278, 2011
192011
The generalized flexible job shop scheduling problem
V Boyer, J Vallikavungal, XC Rodríguez, MA Salazar-Aguilar
Computers & Industrial Engineering 160, 107542, 2021
182021
Vehicle and reliable driver scheduling for public bus transportation systems
A Andrade-Michel, YA Ríos-Solís, V Boyer
Transportation Research Part B: Methodological 145, 290-301, 2021
172021
GPU computing applied to linear and mixed-integer programming
V Boyer, D El Baz, MA Salazar-Aguilar
Advances in GPU, Research and Practice, 247-271, 2017
152017
Training many neural networks in parallel via back-propagation
JA Cruz-López, V Boyer, D El-Baz
2017 IEEE International Parallel and Distributed Processing Symposium …, 2017
102017
The system can't perform the operation now. Try again later.
Articles 1–20