Delay mitigation in the Malaysian construction industry H Abdul-Rahman, MA Berawi, AR Berawi, O Mohamed, M Othman, ... Journal of construction engineering and management 132 (2), 125-133, 2006 | 408 | 2006 |
Advanced nanomaterials in oil and gas industry: Design, application and challenges M Khalil, BM Jan, CW Tong, MA Berawi Applied energy 191, 287-310, 2017 | 215 | 2017 |
Waste to energy technology: The potential of sustainable biogas production from animal waste in Indonesia M Khalil, MA Berawi, R Heryanto, A Rizalie Renewable and Sustainable Energy Reviews 105, 323-331, 2019 | 184 | 2019 |
Second generation bioethanol potential from selected Malaysia’s biodiversity biomasses: A review HB Aditiya, WT Chong, TMI Mahlia, AH Sebayang, MA Berawi, H Nur Waste Management 47, 46-61, 2016 | 145 | 2016 |
Conceptual delay mitigation model using a project learning approach in practice H Abdul‐Rahman, IA Yahya, MA Berawi, LW Wah Construction Management and Economics 26 (1), 15-27, 2008 | 101 | 2008 |
Quality revolution: leading the innovation and competitive advantages MA Berawi International Journal of Quality & Reliability Management, 2004 | 92 | 2004 |
Aplikasi value engineering pada industri konstruksi bangunan gedung MA Berawi Universitas Indonesia, Jakarta, 2014 | 66 | 2014 |
Empowering healthcare, economic, and social resilience during global pandemic Covid-19 MA Berawi International Journal of Technology 11 (3), 436-439, 2020 | 63 | 2020 |
Application of knowledge management in production management MA Berawi, RM Woodhead Human Factors and Ergonomics in Manufacturing & Service Industries 15 (3 …, 2005 | 49 | 2005 |
The role of industry 4.0 in achieving Sustainable Development Goals MA Berawi International Journal of Technology 10 (4), 644-647, 2019 | 47 | 2019 |
Perkembangan kebijakan pembiayaan infrastruktur transportasi berbasis kerjasama pemerintah swasta di Indonesia B Susantono, MA Berawi Jurnal Transportasi 12 (2), 2012 | 44 | 2012 |
Tackling the COVID-19 pandemic: Managing the cause, spread, and impact MA Berawi, N Suwartha, E Kusrini, AH Yuwono, R Harwahyu, ... International journal of technology 11 (2), 209-214, 2020 | 41 | 2020 |
Enhancing value for money of mega infrastructure projects development using value engineering method MA Berawi, B Susantono, P Miraj, ARB Berawi, HZ Rahman, A Husin Procedia technology 16, 1037-1046, 2014 | 39 | 2014 |
An alternative theory of idea generation K Morrell, R Natural, JW Ong Int. J. Management Practice 3 (1), 1, 2008 | 39 | 2008 |
Stakeholders' perspectives on green building rating: A case study in Indonesia MA Berawi, P Miraj, R Windrayani, ARB Berawi Heliyon 5 (3), e01328, 2019 | 38 | 2019 |
Optimizing land use allocation of Transit-Oriented Development (TOD) to generate maximum ridership MA Berawi, G Saroji, FA Iskandar, BE Ibrahim, P Miraj, M Sari Sustainability 12 (9), 3798, 2020 | 36 | 2020 |
Utilizing big data in industry 4.0: Managing competitive advantages and business ethics MA Berawi International Journal of Technology 9 (3), 430-433, 2018 | 36 | 2018 |
The fourth industrial revolution: Managing technology development for competitiveness MA Berawi International Journal of Technology 9 (1), 1-4, 2018 | 35 | 2018 |
A review of the Issues and Strategies of stakeholder Management in the construction industry SB Abd Karim, H Abdul Rahman, MA Berawi, A Jaapar Management in Construction and Researchers Association (MICRA) Meetings and …, 2007 | 35 | 2007 |
Does professional ethic affects construction quality HA Rahman, SBA Karim, MSM Danuri, MA Berawi, XW Yap Quantity Surveying International Conference, 4-5, 2007 | 35 | 2007 |