Follow
M Arslan Ornek
M Arslan Ornek
Verified email at yasar.edu.tr
Title
Cited by
Cited by
Year
A simulation based experimental design to analyze factors affecting production flow time
BY Ekren, AM Ornek
Simulation Modelling Practice and Theory 16 (3), 278-293, 2008
742008
Cyclic scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, A Örnek
Journal of Manufacturing Systems 36, 147-158, 2015
412015
Balancing and scheduling of flexible mixed model assembly lines
C Öztürk, S Tunalı, B Hnich, MA Örnek
Constraints 18, 434-469, 2013
402013
Simulation analysis of lot streaming in job shops with transportation queue disciplines
RS Edis, A Ornek
Simulation Modelling Practice and Theory 17 (2), 442-453, 2009
392009
A vehicle scheduling problem with fixed trips and time limitations
DT Eliiyi, A Ornek, SS Karakütük
International Journal of Production Economics 117 (1), 150-161, 2009
352009
Balancing and scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, A Örnek
The International Journal of Advanced Manufacturing Technology 67, 2577-2591, 2013
332013
Capacitated lot sizing with linked lots for general product structures in job shops
C Oztürk, AM Ornek
Computers & Industrial Engineering 58 (1), 151-164, 2010
312010
Operational extended model formulations for advanced planning and scheduling systems
C Öztürk, AM Ornek
Applied Mathematical Modelling 38 (1), 181-195, 2014
302014
Capacitated lot sizing with alternative routings and overtime decisions
AM Ornek, O Cengiz
International Journal of Production Research 44 (24), 5363-5389, 2006
302006
Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times
C Ozturk, S Tunali, B Hnich, AM Ornek
Electronic Notes in Discrete Mathematics 36, 65-72, 2010
272010
A tabu search-based heuristic for single-product lot streaming problems in flow shops
R Sancar Edis, MA Ornek
The International Journal of Advanced Manufacturing Technology 43, 1202-1213, 2009
252009
An improved metric for measuring multi-item multi-level schedule instability under rolling schedules
KE Kabak, AM Ornek
Computers & Industrial Engineering 56 (2), 691-707, 2009
252009
OPTIMISATION AND CONSTRAINT BASED HEURISTIC METHODS FOR ADVANCED PLANNING AND SCHEDULING SYSTEMS.
C Ozturk, MA Ornek
International Journal of Industrial Engineering 23 (1), 2016
232016
The Determination of In‐Process Inventory and Manufacturing Lead Time in Multi‐Stage Production Systems
MA Ornek, PI Collier
International Journal of Operations & Production Management 8 (1), 74-80, 1988
201988
Determining optimum (s, S) levels of floor stock items in a paint production environment
BY Ekren, MA Ornek
Simulation Modelling Practice and Theory 57, 133-141, 2015
172015
A MIP based heuristic for capacitated MRP systems
C Öztürk, AM Örnek
Computers & Industrial Engineering 63 (4), 926-942, 2012
172012
Integer and constraint programming model formulations for flight-gate assignment problem
MA Ornek, C Ozturk, I Sugut
Operational Research 22 (1), 135-163, 2022
142022
A note on A mixed integer programming model for advanced planning and scheduling (APS)
MA Örnek, S Özpeynirci, C Ozturk
European Journal of Operatıonal Research, 2010
142010
A goal programming approach to lean production system implementation
SS Karakutuk, MA Ornek
Journal of the Operational Research Society 74 (1), 403-416, 2023
102023
An application of a circular economy approach to design an energy-efficient heat recovery system
SS Karakutuk, S Akpinar, MA Ornek
Journal of Cleaner Production 320, 128851, 2021
102021
The system can't perform the operation now. Try again later.
Articles 1–20