Rachid Benmansour
Rachid Benmansour
INSEA (SI2M Laboratory)
Verified email at insea.ac.ma
Title
Cited by
Cited by
Year
Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance
R Benmansour, H Allaoui, A Artiba, S Hanafi
Computers & Operations Research 47, 106-113, 2014
402014
Nested general variable neighborhood search for the periodic maintenance problem
R Todosijević, R Benmansour, S Hanafi, N Mladenović, A Artiba
European Journal of Operational Research 252 (2), 385-396, 2016
252016
Scheduling preventive railway maintenance activities with resource constraints
R Macedo, R Benmansour, A Artiba, N Mladenović, D Urošević
Electronic Notes in Discrete Mathematics 58, 215-222, 2017
212017
Simulation‐based approach to joint production and preventive maintenance scheduling on a failure‐prone machine
R Benmansour, H Allaoui, A Artiba, S Iassinovski, R Pellerin
Journal of Quality in Maintenance Engineering, 2011
212011
Stochastic single machine scheduling with random common due date
R Benmansour, H Allaoui, A Artiba
International journal of production research 50 (13), 3560-3571, 2012
152012
Balancing preventive and corrective maintenance of aircraft assets: A cyber-physical systems approach
M Andreacchio, A Bekrar, R Benmansour, D Trentesaux
2016 IEEE 14th International Conference on Industrial Informatics (INDIN …, 2016
102016
Ant colony optimisation combined with variable neighbourhood search for scheduling preventive railway maintenance activities
S Khalouli, R Benmansour, S Hanafi
International Journal of Intelligent Engineering Informatics 6 (1-2), 78-98, 2018
72018
An ant colony algorithm based on opportunities for scheduling the preventive railway maintenance
S Khalouli, R Benmansour, S Hanafi
2016 International Conference on Control, Decision and Information …, 2016
72016
On the joint optimization of the periodic preventive maintenance and the spare parts inventory problem
A Mjirda, R Benmansour, H Allaoui, G Goncalves
IFAC-PapersOnLine 49 (12), 881-885, 2016
72016
Hardware resource utilization optimization in FPGA-based Heterogeneous MPSoC architectures
B Dammak, M Baklouti, R Benmansour, S Niar, M Abid
Microprocessors and Microsystems 39 (8), 1108-1118, 2015
72015
On the single-processor scheduling problem with time restrictions
R Benmansour, O Braun, A Artiba
2014 International Conference on Control, Decision and Information …, 2014
72014
An accelerated MIP model for the single machine scheduling with preventive maintenance
O Souissi, R Benmansour, A Artiba
IFAC-PapersOnLine 49 (12), 1945-1949, 2016
62016
On the complexity of robotic flow shop with transportation constraints
N Chikhi, M Abbas, A Bekrar, R Benmansour, S Hanafi
ROADEF-15ème congrès annuel de la Société française de recherche …, 2014
62014
A mixed integer linear programming approach for design space exploration in FPGA-based MPSoC
B Dammak, R Benmansour, S Niar, M Baklouti, M Abid
2014 24th International Conference on Field Programmable Logic and …, 2014
52014
Mathematical programming and heuristics for scheduling problems with early and tardy penalties
M Ratli, R Benmansour, R Macedo, S Hanafi, C Wilbaut
Metaheuristics for Production Scheduling, 183-223, 2013
52013
Approximation of continuous distribution via the generalized Erlang distribution
SE Elmagrhraby, R Benmansour, A Artiba, H Allaoui
IFAC Proceedings Volumes 42 (4), 240-245, 2009
52009
Modelling and solving the multi-quays berth allocation and crane assignment problem with availability constraints
I Krimi, R Todosijević, R Benmansour, M Ratli, AA El Cadi, A Aloullal
Journal of Global Optimization 78 (2), 349-373, 2020
42020
A two-stage flow shop scheduling problem with transportation considerations
N Chikhi, M Abbas, R Benmansour, A Bekrar, S Hanafi
4OR 13 (4), 381-402, 2015
42015
A joint optimization-simulation model to minimize the makespan on a repairable machine
AA el Cadi, R Benmansour, F Serraj, A Artiba
2015 International Conference on Industrial Engineering and Systems …, 2015
42015
A case study of a two-stage flow shop with dedicated machines and a single robot
N Chikhi, R Benmansour, A Bekrar, S Hanafi, M Abbas
2014 International Conference on Control, Decision and Information …, 2014
42014
The system can't perform the operation now. Try again later.
Articles 1–20