Follow
Hervé Camus
Hervé Camus
EC Lille - LAGIS équipe OSL
Verified email at ec-lille.fr
Title
Cited by
Cited by
Year
FMS Cyclic Scheduling with Overlapping production cycles
O Korbaa, H Camus, JC Gentina
Proceedings of 18th International Conference on Application and Theory of …, 1997
441997
A new cyclic scheduling algorithm for flexible manufacturing systems
O Korbaa, H Camus, JC Gentina
International Journal of Flexible Manufacturing Systems 14 (2), 173-187, 2002
402002
Petri net modeling of ratio-driven flexible manufacturing systems and implications on the WIP for cyclic schedules
H Ohl, H Camus, E Castelain, JC Gentina
Systems, Man and Cybernetics, 1995. Intelligent Systems for the 21st Century …, 1995
401995
Optimal control of a nested-multiple-product assemble-to-order system
M ElHafsi, H Camus, E Craye
International Journal of Production Research 46 (19), 5367-5392, 2008
382008
Cyclic schedules in flexible manufacturing systems with flexibilities in operating sequences
H Camus, H Ohl, O Korbaa, JC Gentina
Proceedings of the 17th International Conference on Application and Theory …, 1996
381996
A heuristic algorithm for the computation of cyclic schedules and the necessary WIP to obtain optimal cycle time
H Ohl, H Camus, E Castelain, JC Gentina
Computer Integrated Manufacturing and Automation Technology, 1994 …, 1994
251994
An assemble-to-order system with product and components demand with lost sales
M Elhafsi, L Zhi, H Camus, E Craye
International Journal of Production Research 53 (3), 718-735, 2015
242015
Conduite de systèmes flexibles de production manufacturière par composition de régimes permanents cycliques: modélisation et évalution de performances à l'aide des réseaux de Petri
H Camus
Lille 1, 1997
231997
Managing an integrated production inventory system with information on the production and demand status and multiple non-unitary demand classes
M ElHafsi, H Camus, E Craye
European Journal of Operational Research 207 (2), 986-1001, 2010
192010
Reducing the computational complexity of scheduling problems in Petri nets by means of transformation rules
JC Mugarza, H Camus, J Gentina, E Teruel, M Silva
Systems, Man, and Cybernetics, 1998. 1998 IEEE International Conference on 1 …, 1998
141998
Heuristic for the resolution of the general fms cyclic scheduling problem
O Korbaa, H Camus, JC Gentina
Systems, Man, and Cybernetics, 1997. Computational Cybernetics and …, 1997
121997
A new cycle scheduling algorithm for flexible manufacturing systems
O Korbaa, H Camus, JC Gentina
Flexible Services and Manufacturing Journal 14 (2), 177, 2002
112002
Transient state study for cyclic schedules: bounds and optimization
O Korbaa, H Camus, JC Gentina
Assembly and Task Planning, 1997. ISATP 97., 1997 IEEE International …, 1997
101997
Optimal control of a continuous-time W-configuration assemble-to-order system
M ElHafsi, J Fang, H Camus
European Journal of Operational Research 267 (3), 917-932, 2018
92018
Cyclic schedules in Flexible Manufacturing Systems with groups of identical machines
H Camus, H Ohl, O Korbaa, JC Gentina
Proceedings of CIMAT 96, 345-350, 1996
81996
A mixed integer linear programming approach to schedule the operating room
F Maaroufi, H Camus, O Korbaa
Systems, Man, and Cybernetics (SMC), 2016 IEEE International Conference on …, 2016
72016
Evolutionary Approach for Multi-Objective Scheduling in Surgical Unit
W Chandoul, S Hammadi, H Camus, H Zgaya, C Di Pompeo, F Trincaretto
Conférence Francophone Gestion et Ingénierie des Systèmes Hospitaliers …, 2012
72012
Business Process Optimization by Workflow Analysis.
AH Shraideh, HG Camus, PGM Yim
CAINE, 108-113, 2009
72009
Short term planning of cyclic production in FMSs
I Chaieb, O Korbaa, H Camus
29th International Conference on Computers and Industrial Engineering …, 2001
52001
Scheduling Petri net models and structural analysis
H Camus, JC Murgarza, E Teruel, JC Gentina, M Silva
Vol. 3: Proceedings of CESA'98, Symposium on Industrial and Manufacturing …, 1998
51998
The system can't perform the operation now. Try again later.
Articles 1–20