Follow
Majid Ataee-pour
Title
Cited by
Cited by
Year
Development of a model to predict peak particle velocity in a blasting operation
H Dehghani, M Ataee-Pour
International Journal of Rock Mechanics and Mining Sciences 48 (1), 51-58, 2011
1472011
Integration of sustainable development concepts in open pit mine design
N Adibi, M Ataee-pour, M Rahmanpour
Journal of Cleaner Production 108, 1037-1049, 2015
872015
Determination of the effect of operating cost uncertainty on mining project evaluation
H Dehghani, M Ataee-Pour
Resources Policy 37 (1), 109-117, 2012
782012
A critical survey of the existing stope layout optimization techniques
M Ataee-Pour
Journal of Mining Science 41, 447-466, 2005
752005
A new model for mining method selection of mineral deposit based on fuzzy decision making
F Samimi Namin, K Shahriar, M Ataee-Pour, H Dehghani
Journal of the Southern African Institute of Mining and Metallurgy 108 (7 …, 2008
672008
A heuristic algorithm to optimise stope boundaries
M Ataee-Pour
572000
Evaluation of the mining projects under economic uncertainties using multidimensional binomial tree
H Dehghani, M Ataee-pour, A Esfahanipour
Resources Policy 39, 124-133, 2014
492014
A 3D approximate hybrid algorithm for stope boundary optimization
V Nikbin, M Ataee-Pour, K Shahriar, Y Pourrahimian
Computers & Operations Research 115, 104475, 2020
372020
Optimisation of stope limits using a heuristic approach
M Ataee-Pour
Mining Technology 113 (2), 123-128, 2004
352004
Channel characterization using multiple-point geostatistics, neural network, and modern analogy: A case study from a carbonate reservoir, southwest Iran
S Hashemi, A Javaherian, M Ataee-pour, P Tahmasebi, H Khoshdel
Journal of Applied Geophysics 111, 47-58, 2014
322014
A 2D dynamic programming algorithm to optimize stope boundaries
SE Jalali, M Ataee-Pour
Proceedings of the 13th Symposium on Mine Planning and Equipment Selection …, 2004
282004
Investigating the impact of gas emission uncertainty on airflow distribution in an auxiliary ventilation system using CFD and Monte-Carlo simulation
S Rahimi, M Ataee-pour, H Madani, SM Aminossadati
Building and Environment 204, 108165, 2021
272021
Pit limits optimization using a stochastic process
SE Jalali, M Ataee-Pour, K Shahriar
CIM Magazine 1 (6), 90, 2006
262006
Determination of the effect of economic uncertainties on mining project evaluation using Real Option Valuation
H Dehghani, M Ataee-Pour
International Journal of Mining and Mineral Engineering 4 (4), 265-277, 2013
232013
Stope boundary optimization: A mathematical model and efficient heuristics
V Nikbin, M Ataee-Pour, K Shahriar, Y Pourrahimian, SA MirHassani
Resources Policy 62, 515-526, 2019
212019
Improvement of Lagrangian relaxation performance for open pit mines constrained long-term production scheduling problem
E Moosavi, J Gholamnejad, M Ataee-Pour, E Khorram
Journal of Central South University 21, 2848-2856, 2014
212014
A hybrid augmented Lagrangian multiplier method for the open pit mines long-term production scheduling problem optimization
E Moosavi, J Gholamnejad, M Ataee-Pour, E Khorram
Journal of Mining Science 50, 1047-1060, 2014
202014
Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade
E Moosavi, J Gholamnejad, M Ataee-Pour, E Khorram
Gospodarka Surowcami Mineralnymi 30, 2014
192014
Estimations of utility function and values of sustainable mining via the choice experiment method
S Narrei, M Ataee-pour
Journal of Cleaner production 267, 121938, 2020
172020
A new heuristic algorithm to optimise stope boundaries
M Ataee-Pour
Proceeding of the 2nd Regional APCOM Symposium on Computer Applications in …, 1997
171997
The system can't perform the operation now. Try again later.
Articles 1–20