Подписаться
Mehdi Foumani
Mehdi Foumani
Подтвержден адрес электронной почты в домене xjtlu.edu.cn
Название
Процитировано
Процитировано
Год
A transformation technique for the clustered generalized traveling salesman problem with applications to logistics
P Baniasadi, M Foumani, K Smith-Miles, V Ejov
European Journal of Operational Research 285 (2), 444-457, 2020
1362020
The impact of various carbon reduction policies on green flowshop scheduling
M Foumani, K Smith-Miles
Applied Energy 249, 300-315, 2019
1032019
A cross-entropy method for optimising robotic automated storage and retrieval systems
M Foumani, A Moeini, M Haythorpe, K Smith-Miles
International Journal of Production Research 56 (19), 6450-6472, 2018
612018
Stochastic optimization of two-machine flow shop robotic cells with controllable inspection times: From theory toward practice
M Foumani, A Razeghi, K Smith-Miles
Robotics and Computer-Integrated Manufacturing 61, 101822, 2020
552020
Fitting the three-parameter Weibull distribution with Cross Entropy
A Moeini, K Jenab, M Mohammadi, M Foumani
Applied Mathematical Modelling 37 (9), 6354-6363, 2013
432013
Cycle time analysis in reentrant robotic cells with swap ability
M Foumani, K Jenab
International Journal of Production Research 50 (22), 6372-6387, 2012
412012
Analysis of flexible robotic cells with improved pure cycle
M Foumani, K Jenab
International Journal of Computer Integrated Manufacturing 26 (3), 201-215, 2013
362013
Scheduling of multi-robot job shop systems in dynamic environments: mixed-integer linear programming and constraint programming approaches
S Fatemi-Anaraki, R Tavakkoli-Moghaddam, M Foumani, B Vahedi-Nouri
Omega 115, 102770, 2023
342023
Scheduling of two-machine robotic rework cells: In-process, post-process and in-line inspection scenarios
M Foumani, K Smith-Miles, I Gunawan
Robotics and Autonomous Systems 91, 210-225, 2017
282017
Cyclic scheduling of a robotic flexible cell with load lock and swap
F Jolai, M Foumani, R Tavakoli-Moghadam, P Fattahi
Journal of Intelligent Manufacturing 23, 1885-1891, 2012
282012
Notes on feasibility and optimality conditions of small-scale multifunction robotic cell scheduling problems with pickup restrictions
M Foumani, I Gunawan, K Smith-Miles, MY Ibrahim
IEEE Transactions on Industrial Informatics 11 (3), 821-829, 2014
252014
Scheduling rotationally arranged robotic cells served by a multi-function robot
M Foumani, I Gunawan, Y Ibrahim
International Journal of Production Research 52 (13), 4037-4058, 2014
202014
A framework for stochastic scheduling of two-machine robotic rework cells with in-process inspection system
M Foumani, K Smith-Miles, I Gunawan, A Moeini
Computers & Industrial Engineering 112, 492-502, 2017
162017
Resolution of deadlocks in a robotic cell scheduling problem with post-process inspection system: Avoidance and recovery scenarios
M Foumani, I Gunawan, K Smith-Miles
2015 IEEE International Conference on Industrial Engineering and Engineering …, 2015
152015
Scheduling dual gripper robotic cells with a hub machine
M Foumani, MY Ibrahim, I Gunawan
2013 IEEE International Symposium on Industrial Electronics, 1-6, 2013
132013
Increasing throughput for a class of two-machine robotic cells served by a multifunction robot
M Foumani, I Gunawan, K Smith-Miles
IEEE Transactions on Automation Science and Engineering 14 (2), 1150-1159, 2015
112015
A scalarization-based method for multiple part-type scheduling of two-machine robotic systems with non-destructive testing technologies
M Foumani, R Tavakkoli Moghaddam
Iranian Journal of Operations Research 10 (1), 1-17, 2019
92019
Process capability analysis in the presence of autocorrelation
M Mohamadi, M Foumani, B Abbasi
Journal of Optimization in Industrial Engineering 4 (9), 15-20, 2011
82011
Utilisation of pruned Pareto-optimal solutions in the multi objective optimisation: an application to system redundancy allocation problems
A Moeini, M Foumani, K Jenab
International Journal of Applied Decision Sciences 6 (1), 50-65, 2013
72013
Operation and configuration-based analysis of dual-gripper robotic cells
K Jenab, M Foumani, A Sarfaraz, M Rajai, P Weinsierm
International Journal of Agile Manufacturing 12 (1), 1-12, 2012
52012
В данный момент система не может выполнить эту операцию. Повторите попытку позднее.
Статьи 1–20