A hybrid PSO algorithm for a multi-objective assembly line balancing problem with flexible operation times, sequence-dependent setup times and learning effect N Hamta, SMT Fatemi Ghomi, F Jolai, M Akbarpour Shirazi International Journal of Production Economics 141 (1), 99-111, 2013 | 222 | 2013 |
Bi-criteria assembly line balancing by considering flexible operation times N Hamta, SMT Fatemi Ghomi, F Jolai, U Bahalke Applied Mathematical Modelling 35 (12), 5592-5608, 2011 | 64 | 2011 |
Supply chain network optimization considering assembly line balancing and demand uncertainty N Hamta, M Akbarpour Shirazi, SMT Fatemi Ghomi, S Behdad International Journal of Production Research 53 (10), 2970-2994, 2015 | 49 | 2015 |
Presenting a goal programming model in the time-cost-quality trade-off N Hamta, M Ehsanifar, J Sarikhani International Journal of Construction Management 21 (1), 1-11, 2021 | 37 | 2021 |
Predictive modeling techniques to forecast energy demand in the United States: A focus on economic and demographic factors A Deka, N Hamta, B Esmaeilian, S Behdad Journal of Energy Resources Technology 138 (2), 022001, 2016 | 31 | 2016 |
Modeling and measuring the structural complexity in assembly supply chain networks N Hamta, M Akbarpour Shirazi, S Behdad, SMT Fatemi Ghomi Journal of Intelligent Manufacturing, 1-17, 2015 | 22 | 2015 |
Improving the Identification and prioritization of the most important risks of safety equipment in FMEA with a hybrid multiple criteria decision-making technique N Hamta, M Ehsanifar, A Babai, A Biglar Journal of applied research on industrial engineering 8 (Special Issue), 1-16, 2021 | 19 | 2021 |
A hybrid metaheuristic for balancing and scheduling the assembly lines with sequence-independent setup times by considering deterioration tasks and learning effect N Hamta, SMT Fatemi Ghomi, R Tavakkoli-Moghaddam, F Jolai Scientia Iranica, Transactions E: Industrial Engineering 21 (3), 963-979, 2014 | 11 | 2014 |
A simulation approach to evaluate performance indices of fuzzy exponential queuing system (An M/M/C model in a banking case study) M Ehsanifar, N Hamta, M Hemesy Journal of Industrial Engineering and Management Studies 4 (2), 35-51, 2017 | 10 | 2017 |
A bi-level programming model for supply chain network optimization with assembly line balancing and push–pull strategy N Hamta, M Akbarpour Shirazi, SMT Fatemi Ghomi Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2016 | 10 | 2016 |
Optimization in supply chain design of assembled products: a case study of HEPCO company N Hamta, M Ehsanifar, A Biglar Iranian Journal of Management Studies 16 (1), 61-77, 2023 | 9 | 2023 |
Integration of liability payment and new funding entries in the optimal design of a supply chain network A Biglar, N Hamta, M Ahmadi Rad Advances in Mathematical Finance and Applications 7 (3), 715-740, 2022 | 9 | 2022 |
Multi-objective Assembly Line Balancing Problem with Bounded Processing Times, Learning Effect, and Sequence-Dependent Setup Times N Hamta, SMT Fatemi Ghomi, Hakimi-Asiabar M, P Hooshangi Tabrizi Industrial Engineering and Engineering Management (IEEM), IEEE International …, 2011 | 9* | 2011 |
A new heuristic algorithm for multi vehicle routing problem with and/or-Type precedence constraints and hard time windows U Bahalke, N Hamta, AR Shojaeifard, M Alimoradi, S Rabiee Operational Research in Engineering Sciences: Theory and Applications 5 (2 …, 2022 | 8 | 2022 |
A novel bi-level stochastic programming model for supply chain network design with assembly line balancing under demand uncertainty N Hamta, M Akbarpour Shirazi, S Behdad, M Ehsanifar Journal of Industrial and Systems Engineering 10 (2), 2017 | 7 | 2017 |
Optimal hospital location using combined approach of GIS and ANP under fuzzy environment (Case Study in Arak City) M Ehsanifar, N Hamta, M Saghari Journal of Structural and Construction Engineering 8 (6), 301-324, 2021 | 6 | 2021 |
A Mathematical Programming Approach to Supply Chain Network Design considering Shareholder Value Creation A Biglar, N Hamta, MA Rad Discrete Dynamics in Nature and Society 2022 (1), 2072301, 2022 | 5 | 2022 |
SINGLE MACHINE SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND DETERIORATING JOBS N Hamta, SMT Fatemi Ghomi, U Bahalke, HR Golpaigani International Journal of Engineering-Transactions A: Basics 24 (2), 115, 2011 | 3* | 2011 |
Assessing Credit Risk in the Banking System Using Data Mining Techniques N Hamta, M Ehsanifar, B Mohammadi Journal of Development & Evolution Mnagement 10 (special issue), 141-150, 2019 | 2 | 2019 |
Presenting a new model in discrete time-cost trade-off problem of project with budget constraints N Hamta, M Ehsanifar, A Moghaddasi Modern Research in Decision Making 2 (4), 255-273, 2018 | 2* | 2018 |