Follow
Majid Aminnayeri
Majid Aminnayeri
Associate Professor of Industrial Engineering, Amirkabir University of Technology
Verified email at aut.ac.ir
Title
Cited by
Cited by
Year
Solving the integrated scheduling of production and rail transportation problem by Keshtel algorithm
M Hajiaghaei-Keshteli, M Aminnayeri
Applied Soft Computing 25, 184-203, 2014
1272014
Type II robotic assembly line balancing problem: An evolution strategies algorithm for a multi-objective model
A Yoosefelahi, M Aminnayeri, H Mosadegh, HD Ardakani
Journal of Manufacturing Systems 31 (2), 139-151, 2012
1272012
Scheduling open shops with parallel machines to minimize total completion time
B Naderi, SMTF Ghomi, M Aminnayeri, M Zandieh
Journal of Computational and Applied Mathematics 235 (5), 1275-1287, 2011
922011
Integrated scheduling of production and rail transportation
M Hajiaghaei-Keshteli, M Aminnayeri, SMTF Ghomi
Computers & Industrial Engineering 74, 240-256, 2014
762014
A high performing metaheuristic for job shop scheduling with sequence-dependent setup times
B Naderi, SMTF Ghomi, M Aminnayeri
Applied Soft Computing 10 (3), 703-710, 2010
752010
A contribution and new heuristics for open shop scheduling
B Naderi, SMTF Ghomi, M Aminnayeri, M Zandieh
Computers & Operations Research 37 (1), 213-221, 2010
712010
Keshtel Algorithm (KA); a new optimization algorithm inspired by Keshtels’ feeding
M Hajiaghaei-Keshteli, M Aminnayeri
Proceeding in IEEE conference on industrial engineering and management …, 2013
682013
Incorporating periodic preventive maintenance into flexible flowshop scheduling problems
B Naderi, M Zandieh, M Aminnayeri
Applied Soft Computing 11 (2), 2094-2101, 2011
602011
Comparison of different input selection algorithms in neuro-fuzzy modeling
M Alizadeh, F Jolai, M Aminnayeri, R Rada
Expert Systems with Applications 39 (1), 1536-1544, 2012
422012
A study on open shop scheduling to minimise total tardiness
B Naderi, SMT Fatemi Ghomi, M Aminnayeri, M Zandieh
International Journal of Production Research 49 (15), 4657-4678, 2011
382011
An MLE approach for estimating the time of step changes in Poisson regression profiles
A Sharafi, M Aminnayeri, A Amiri
Scientia Iranica 20 (3), 855-860, 2013
322013
Multi-objective no-wait flowshop scheduling problems: models and algorithms
B Naderi, M Aminnayeri, M Piri, MH Ha'iri Yazdi
International Journal of Production Research 50 (10), 2592-2608, 2012
322012
Multistage portfolio optimization with stocks and options
H Davari‐Ardakani, M Aminnayeri, A Seifi
International Transactions in Operational Research 23 (3), 593-622, 2016
302016
Modeling and scheduling open shops with sequence-dependent setup times to minimize total completion time
B Naderi, SMTF Ghomi, M Aminnayeri, M Zandieh
The International Journal of Advanced Manufacturing Technology 53, 751-760, 2011
302011
Risk-adjusted Bernoulli chart in multi-stage healthcare processes based on state-space model with a latent risk variable and dynamic probability control limits
F Sogandi, M Aminnayeri, A Mohammadpour, A Amiri
Computers & Industrial Engineering 130, 699-713, 2019
272019
Identifying the time of step change in binary profiles
A Sharafi, M Aminnayeri, A Amiri
The International Journal of Advanced Manufacturing Technology 63, 209-214, 2012
242012
Optimizing the admission time of outbound trucks entering a cross-dock with uniform arrival time by considering a queuing model
A Motaghedi-Larijani, M Aminnayeri
Engineering Optimization 49 (3), 466-480, 2017
212017
Process capability indices for logistic regression profile
M Rezaye Abbasi Charkhi, M Aminnayeri, A Amiri
Quality and Reliability Engineering International 32 (5), 1655-1661, 2016
192016
Statistical monitoring of polytomous logistic profiles in phase II
R Noorossana, M Aminnayeri, H Izadbakhsh
Scientia Iranica 20 (3), 958-966, 2013
192013
Estimating the change point of correlated Poisson count processes
E Asghari Torkamani, STA Niaki, M Aminnayeri, M Davoodi
Quality Engineering 26 (2), 182-195, 2014
172014
The system can't perform the operation now. Try again later.
Articles 1–20